For facilities and maintenance coordinators

Find overdue and unrecorded asset inspections

Certant compares your approved inspection schedule with the reports you've received and shows which inspections are overdue and which have no record.

Configured for each asset class, from your own schedule.

FP-02 · Fire pump, Building AExample

Monthly test due 31 Oct 2026. Last recorded 28 Sep 2026.

Overdue Contractor report, 28 Sep 2026 · page 3
The due date from the schedule and the last report on file.
The problem

Nobody notices a missing report

The inspection schedule says every fire pump is tested monthly. The reports arrive from contractors as PDFs, and the only way to know one is missing is to notice it didn't arrive.

An inspection that was done late and an inspection with no record at all look the same in an empty folder.

The documents

What Certant reads

Each report is matched to its asset by the tag or location it names.

DocumentWhat it supplies
Inspection scheduleEach asset, the inspections it needs and how often.
Inspection reportsThe asset inspected, the date and the result, as contractors or your own team recorded them.
Asset registerAsset tags, locations and classes, so a report lands against the right asset.
The result

See what's overdue and what's missing

Inspection register, checked 3 Nov 2026Example
AssetInspectionDueLast recordedStatusSource
FP-02 · Fire pump, Building AMonthly test31 Oct 202628 Sep 2026
Overdue
Contractor report, 28 Sep 2026 · page 3
EL-11 · Emergency lighting, Building BSix-monthly test30 Sep 2026No report on file
No record
Inspection schedule · row 46
BK-04 · Backflow valve, Building AAnnual test20 Nov 202622 Nov 2025
Due in 17 days
Test certificate, 22 Nov 2025 · page 1
LF-07 · Passenger lift, Building CAnnual inspection15 Jan 202714 Jan 2026
Not yet due
Inspection certificate, 14 Jan 2026 · page 1
FP-02 has earlier reports and is late. EL-11 has never had a report filed, so it's marked as no record.
The approval

Approve the reminder or work order

Certant drafts a reminder to the contractor, or a work-order request for your maintenance team, with the asset record and the last report attached. A coordinator approves it before it's sent.

Raising the work order inside your maintenance system depends on a connection configured for your deployment.

Proposed reminderExample
To
Fire services contractor
Draft
"The monthly test for fire pump FP-02 in Building A was due on 31 October 2026. The last report we hold is dated 28 September. Please confirm when the October test was done and send the report."
Attached
schedule row, report of 28 September
Waiting for approval · Maintenance coordinator
Scope

What setup involves

We start with one asset class, such as fire services or lifts. You supply the schedule and the reports received so far, and we agree how a report is matched to its asset.

AreaWhat to expect
BasisThe check uses the schedule you approve and the reports you supply.
ConditionCertant reads what the reports record. It doesn't predict failures or estimate how long an asset has left.
Work ordersRequests wait for a person. Nothing is dispatched to a maintenance system automatically.
Related

Related use cases

Warranty recovery review

Recorded failures that may fall inside a documented warranty.

See the use case

Incident action deadlines

Incident follow-ups that are overdue or have no owner.

See the use case

Supplier document expiry

Certificates and licences that have expired or were never supplied.

See the use case
See all use cases

Bring a schedule and its reports

Send us the inspection schedule for one asset class and the reports you've received. We'll show you what's overdue and what was never recorded.

Strata is a paid add-on for the Business plan and above. Certant Cloud, your cloud, or fully air-gapped.