For water utilities and monitoring teams

Query the readings in your monitoring reports

Certant pulls readings out of monitoring PDFs, compares them with the limits in your approved documents and shows every site-month with no reading.

Every reading opens the report page it was read from.

Aqua Valley Water · Eastern Catchment Intake · March 2025Example

Turbidity recorded 5.6 NTU. Documented limit 5.0 NTU.

Above documented limit Monthly monitoring report, March 2025 · table 3 · page 7 Water quality management plan · section 4.2 · page 18
Aqua Valley Water is a fictional authority used for demonstration.
The problem

Years of readings sit in PDFs

Each monthly report has a table of readings by site. To answer one question across three years you open thirty-six PDFs, and a month where a site didn't report is easy to miss among them.

The documents

What Certant reads

Tables that change layout from one year's report to the next are read into the same set of readings.

DocumentWhat it supplies
Monitoring reportsThe tables of readings in each monthly or annual report, by site, measure and date.
Approved limitsThe limit for each measure, from your own management plan, licence conditions or operating procedure.
Site listThe sites and periods you expect a reading for.
The result

Open a reading at its page

A reading above the documented limitExample
Site
Eastern Catchment Intake
Period
March 2025
Measure
Turbidity
Recorded
5.6 NTU
Documented limit
5.0 NTU
Verdict
Above documented limit
Reading source
Monthly monitoring report, March 2025 · table 3 · page 7
Limit source
Water quality management plan · section 4.2 · page 18
Turbidity readings received, January to June 2025Example
SiteJanFebMarAprMayJun
Eastern Catchment Intake2.32.65.62.42.22.5
Western Bore1.92.02.1No reading2.01.9
Northern Reservoir2.12.22.02.32.22.1
The grid marks March at Eastern Catchment Intake as a reading above the limit, and April at Western Bore as a missing reading.
Ask across the reportsExample

"What was the average turbidity at Eastern Catchment Intake in 2024?"

Answer

2.40 NTU, averaged across the FY2024 report.

Water quality report, FY2024 · table 3 · page 6
The approval

Your team decides what happens next

When a reading is above its documented limit, or a site-month is missing, Certant raises it with the sources attached and drafts a follow-up. A monitoring lead reviews the draft before anything is sent.

Proposed follow-upExample
To
Western Bore site operator
Draft
"We hold no turbidity reading for Western Bore in April 2025. March and May are on file. Could you send the April results, or confirm that no sample was taken?"
Waiting for approval · Monitoring lead
Scope

What setup involves

We load a run of your monitoring reports and the document that states your limits. You check the extracted readings against a few reports you know well before relying on the rest.

AreaWhat to expect
PurposeThis is reporting and evidence review. It doesn't control a treatment process or give water-safety advice.
LimitsEvery limit comes from a document you have approved. Certant doesn't supply regulatory thresholds of its own.
GapsA site-month with no reading is shown as a gap and is never filled with an estimate.
Related

Related use cases

Regulatory return gaps

Sites and periods missing from the returns you hold.

See the use case

Production report gaps

Plants and periods with no operating report.

See the use case

Quality deviation review

Batch results checked against the approved specification.

See the use case
See all use cases

Bring a year of reports

Send us twelve months of monitoring reports and the plan that sets your limits. We'll show you the readings as a table you can question.

Strata is a paid add-on for the Business plan and above. Certant Cloud, your cloud, or fully air-gapped.